Soleste On The Bay: Hard Hat Tour
May 13
3:00 pm - 4:00 pm
Description
Soleste on the Bay is a 28-story mixed-use tower in the final stages of construction in North Miami Beach, located in close proximity to Oleta River State Park. Developed by The Estates Companies, the project is a sister development to the nearby 23-story mixed-use property to the north.
The building comprises 363 residential units and more than 14,000 square feet of retail and restaurant space along Biscayne Boulevard. A comprehensive amenity program includes two swimming pools, a spinning studio and game room, a 2,400+ SF fitness center, a 1,400+ SF spa, a 1,400 SF bar and lounge, and over 10,600 SF of recreation space across the 9th-floor deck and rooftop. The structure features a 21-story tower above an 8-story podium with a parking garage accommodating over 600 spaces. Project completion is anticipated in summer 2026.
Parking could be access from Biscayne Boulevard directly south of the building. Kindly note that FORM group nor the Estates Companies assume no responsibility for any vehicles used.
The Contractors and Developers are requiring everyone attending to submit a signed copy of both documents attached. They are requiring everyone to bring their own hardhats, construction boots, and reflective vests.
PLEASE EMAIL [email protected] TO RECEIVE BOTH COPIES TO SIGN!
Long Pants, Construction Boots, Reflective Vests & Hard Hats are Required